What is FERC pipeline?

What is FERC pipeline?

The Federal Energy Regulatory Commission, or FERC, is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil. FERC also reviews proposals to build liquefied natural gas (LNG) terminals and interstate natural gas pipelines as well as licensing hydropower projects.

How are underground pipelines built?

Typically, pipelines are constructed underneath these obstacles by either boring for shallow depth or using horizontal directional drilling (HDD) for deeper placement. Other obstacles include abandoned mines, karst topography, and densely populated areas. Each obstacles requires a unique method and order of operations.

What is a FERC 7c project?

Under Section 7(c) of the Natural Gas Act of 1938, the Federal Energy Regulatory Commission (FERC) is authorized to issue certificates of “public convenience and necessity” for “the construction or extension of any facilities for the transportation in interstate commerce of natural gas.” Thus, companies seeking to …

What makes a pipeline FERC regulated?

FERC regulates interstate liquids pipelines under the Interstate Commerce Act, which refers to common carriers transporting oil by pipeline between different states. Unlike natural gas pipelines, FERC does not approve the construction (or abandonment) of liquids pipelines.

What is a FERC Form 6?

The FERC Form No. 6 (FERC Form 6) is an annual regulatory reporting requirement (18 C.F.R. § 357.2). These reports are designed to collect both financial and operational informational from oil pipeline companies subject to the jurisdiction of the Federal Energy Regulatory Commission.

What is pipeline project?

Pipeline Project means a proposed use or project for which the City has received all required applications, and required supporting information and documents, and which has been entered into the City’s project tracking system. Sample 1.

What is pipeline layout?

The pipeline layout represents a sequence of descriptor sets with each having a specific layout. This sequence of layouts is used to determine the interface between shader stages and shader resources. Each pipeline is created using a pipeline layout.

On what three types of energy projects is FERC the lead environmental regulator?

The Commission’s main industry/program areas are summarized below:

  • Electric:
  • Natural Gas.
  • Liquefied Natural Gas.
  • Hydropower.
  • Oil.

What is FERC review of natural gas pipelines?

FERC reviews applications for construction and operation of interstate natural gas pipelines under the authority of section 7 of the Natural Gas Act. FERC review ensures that applicants certify that they will comply with Department of Transportation safety standards.

What is the rulemaking process for FERC regulations?

Rulemaking Process: FERC’s proposed regulations are developed through the rulemaking process. A petition for a rulemaking can arise from the energy industry, specific companies, stakeholders and the public. There are four major parts of the process:

What is the pre-filing process for natural gas pipeline permits?

Pre-Filing Environmental Review Process Natural Gas Pipeline & Storage Permitting Processes This process includes consulting with stakeholders, identifying environmental issues through scoping, and preparing environmental documents such as Environmental Assessments or Environmental Impact Statements.

What is the pre-filing environmental review process for liquefied natural gas terminal proposals?

Liquefied Natural Gas Terminal proposals filed with FERC must use the Pre-Filing Environmental Review Process. Applicants are encouraged to explore alternative projects with affected communities that would reduce environmental adverse effects and promote security and safety.